Mumbai: Commuters travelling from Thane towards Vashi and Mumbai will face traffic diversions for the next four months after the Thane-facing arm of the Turbhe flyover on the Sion-Panvel Highway was closed for reconstruction. The stretch will remain shut until March 31, 2027, with motorists advised to use alternative routes through Shiravane, LP Bridge and Juinagar.

To advertise here,

The Navi Mumbai Traffic Police closed the Thane-facing arm of the Turbhe flyover from November 25 to facilitate demolition and reconstruction work.

The closure affects vehicles travelling from Thane towards Vashi and Mumbai. SMC Infrastructure will carry out the reconstruction, according to a traffic notification issued by Deputy Commissioner of Police (Traffic) Dr Rahul Khade.

The Turbhe flyover is an important road link on the Sion-Panvel Highway, connecting Thane, Navi Mumbai and Mumbai.

Turbhe flyover diversion routes: Check alternatives

The traffic police have prescribed different diversion routes for light and heavy vehicles.

For light motor vehicles:

  • Continue along the Sion-Panvel Highway from Thane.
  • Take a right turn beneath either Shiravane Bridge or LP Bridge.
  • Proceed through Juinagar.
  • Use the Turbhe external flyover to travel towards Mumbai.
  • For heavy vehicles:
  • Take a right turn beneath LP Bridge.
  • Proceed through Shiravane and Juinagar.
  • Use the Turbhe external flyover to reach Mumbai.

Why is the Turbhe flyover being reconstructed?

The reconstruction is being carried out in phases.

Work on the first stretch, which carries traffic from Pune towards Mumbai, is already underway. Demolition has now started on the second stretch connecting Thane to Vashi and Mumbai.

According to the report, recurring potholes, road cavities and deteriorating expansion joints continued despite repeated repair work. The Public Works Department (PWD) subsequently decided to undertake complete reconstruction.

Traffic congestion likely during peak hours

The diversion of vehicles through Shiravane, LP Bridge and Juinagar is expected to increase traffic pressure on these roads, particularly during morning and evening rush hours.

The Navi Mumbai Traffic Police have advised motorists to follow the designated diversion routes and allow additional travel time.

Commuters travelling between Thane, Vashi and Mumbai should account for possible delays until the reconstruction work is completed.

The closure affects a key section of the Sion-Panvel Highway, making the diversion particularly important for daily commuters and commercial vehicles.

With the Pune-facing stretch also undergoing reconstruction, traffic movement around Turbhe could remain affected during the work period. Motorists should check traffic police updates before starting their journey and avoid relying on their usual route.