Kathmandu: Nepal on Friday called for tenders from Indian power trading companies to purchase 150 megawatts (MW) of electricity during the dry season.

To advertise here,

Nepal's dependence on run-of-the-river hydropower projects makes electricity generation highly seasonal.

While rising river flows during the summer months enable the country to generate surplus power for export, mainly to India, declining water levels during winter significantly reduce domestic production, forcing it to rely on imports.

The authority has sought proposals through a competitive process to procure electricity for round-the-clock supply.

In a notice published on Friday, the Nepal Electricity Authority (NEA) has stated that companies holding Category I, II and III electricity trading licenses in India are eligible to submit proposals.

The deadline for submitting proposals is 12 p m on December 28. The NEA would open the technical proposals at 1 pm on the same day, according to the notice.

Interested companies must submit their bids electronically through the same portal, it said.

The country's power supply situation has also been affected by the damage caused to several hydropower projects in central Nepal during the devastating Rasuwa-Bhotekoshi floods in August.

Projects with a combined installed capacity of 431 MW have remained disconnected from the national grid following the disaster.

However, domestic generation is expected to improve from mid-April as water levels in rivers gradually rise, reducing Nepal's dependence on imported electricity and potentially allowing it to resume exports.

(This story has not been edited by Mathrubhumi and is published from a syndicated feed.)